Check permissions before buying

Tenants, leaseholders and people in managed buildings may need landlord, freeholder, building manager or planning permission before installing plug-in solar panels.

The current socket-connected route applies in Great Britain, not Northern Ireland. A seller offering delivery does not change the connection rules.

  • Landlord, freeholder or building manager permission checked
  • Planning, listed building or conservation limits considered
  • Insurance impact checked before outdoor equipment is fitted

Check electrical and registration route

The Energy Saving Trust says plug-in panels should go directly into a suitable socket, without extension leads, adaptors or altered plugs. Outdoor sockets need the right rating and may need a qualified electrician.

Register the device after installation and before using it. Have the exact make and model ready for the registration portal.

  • One plug-in solar device per property
  • Suitable circuit and outdoor socket checks completed
  • Make and model ready for plug-in solar registration

Common questions

Is the lowest quote enough if the installer seems good?

No. A plug-in solar offer also needs exact device evidence, permission checks and socket-route clarity.

Should the exact model be checked before purchase?

Yes. The ENA register and the seller model should match before the device is treated as a current plug-in solar pick.

Before you buy

Guidance checked 5 September 2026. Check the latest advice and your exact product before ordering; a comparison is not an electrical or structural survey.

Plug-in kits

Keep the exact device visible beside the price.

Open guide

Battery route

Keep storage claims outside the socket-only shortlist.

Open guide